|
|
Closing the docks |
|
|
|
|
The small dock next to Brewery Bond is filled - May 2009 |
|
|
As work begins to convert the docks the old dock gates were dredged from
the river bed and re-installed. |
The second picture in April 2008 shows leakage - note the nearly complete
call centre on the South shore |
|
|
Despite press publicity of their success, the attempt on the
second set of gates seems to fare no better as the April 2008
picture on the right shows |
The centre dock was
never sealed and at this time (2021) the sealed outer docks are full
of rainwater as seen in the panorama shot later |