Leaky East dock sealed
Call centre on South shore complete
West dock shuttering done
The dock between is to remain open
Seen here in August 2009
It was intended that two buildings would be the shape of the two
outer docks with car parking
in the basement. As it turned out, the intended buildings have not yet been
built and they have filled up with rainwater. (2020)