Car Park - then what? |
|
|
 |
The newly opened Shepherd Energy Park was been
leased to a car dealer who used it to store cars and vans. The crane at the right is the second
tunnel construction site as shown in the previous photo. This occupied
the site for 18 months after which the docks will all be back-filled and
levelled. |
 |
More cars in 2011 - the docks used to build the new tunnel sections are
being in-filled and the unwanted former ice-breaker Ice Maiden is moored. |
 |
By 2013 the vehicles have all been moved elsewhere and the dry-docks
nearly all backfilled. |
 |
Unrecognizable in January 2013 winter sunshine The missing Ice Breaker
is almost demolished in a dock by the crane at the far end |
 |
April 2016 - all filled except the far dock |
 |
May 2019 |